Exfo AXS-200/850 Ethernet Test Set Manual de usuario Pagina 164

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 262
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 163
Traffic Generation & Monitoring
154 AXS-200/850
Summary Results
Summary Results
Press , select Traffic Generation & Monitoring, Results, and the
Summary tab.
³ Status: The status field displays the current status of the traffic
generation test. The Pass/Fail Verdict is displayed on the screen with
the help of the following symbols:
= PASS
= FAIL
The status displays the following:
³ --”: Test is not running and
results are not available.
³ In-Progress: Test is running.
³ Completed: Test is
completed, stopped at the
planned time, or manually
stopped when there is no
set timer.
³ Aborted: Test is interrupted,
test is stopped before the set time.
³ Start Time: The time when the Traffic Generation and Monitoring test
was started.
IMPORTANT
Test results/statistics are cleared when changing test or tool
selection. It is highly advised to generate and save the report once
the current test is completed. Refer to Report Generation on
page 79 to generate and save a report file.
Vista de pagina 163
1 2 ... 159 160 161 162 163 164 165 166 167 168 169 ... 261 262

Comentarios a estos manuales

Sin comentarios