Exfo FTB-3930 MultiTest Manual de usuario Pagina 45

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 101
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 44
Performing Automated IL/ORL/Length Measurements (FasTesT)
Multifunction Loss Tester 39
Referencing Units for FasTesT
To perform a side-by-side reference:
1. On the master unit (the one initiating the test), select the F
ASTEST tab.
2. In the Reference pane, select the Side-by-side reference type. The
data display shows previous reference values (if any) for the currently
connected remote unit.
3. Connect both units through their F
ASTEST ports, using two reference
patchcords and a bulkhead adapter.
IMPORTANT
With its multiple referencing feature, your unit saves the last 10
side-by-side references for each DUT type and compatibility mode.
Reference
patchcord
Bulkhead
adapter
Reference
patchcord
FTB-3930
MULTITEST
FTB-3930
MULTITEST
Vista de pagina 44
1 2 ... 40 41 42 43 44 45 46 47 48 49 50 ... 100 101

Comentarios a estos manuales

Sin comentarios